Services

Grid connections and compliance

G99 and connection application support across DNO, IDNO and transmission environments, from first application to compliance evidence.

The problem this solves

A connection is won or delayed on the quality of its application and supporting evidence. Developers and operators need applications that are right first time, studies that satisfy the network operator, and a clear route through G99 compliance for generation projects.

Project types we support

  • Generation connections, including renewables, hydropower and BESS
  • Demand connections for industrial sites and data centres
  • IDNO network connections and adoptions
  • Transmission-connected projects

Design, calculation and study work

  • Connection feasibility and options assessments
  • G99 compliance assessments and evidence preparation
  • Supporting load flow, fault level and protection studies
  • Connection application preparation and technical liaison

Deliverables

  • Connection applications with complete technical schedules
  • G99 compliance documentation and witness test support
  • Study reports formatted for network operator review
  • Technical responses through the application and offer process

How this reduces risk

A technically complete application avoids the rejection and resubmission cycles that cost months. Compliance evidence prepared alongside the design, rather than after it, protects energisation dates and the revenue that depends on them.

Why appoint Saqib Engineering

We speak the language of the network operator because we design to their specifications every day. Applications and compliance submissions are prepared by engineers who understand what the reviewer needs to see.

Grid connections & compliance

Send the outline: voltage level, environment and programme. A specialist engineer will come back to you with a clear scope.